feat(graph): pipeline graph improvements — on_failure, tooltips, bus-bar connectors, skipped colouring, HTML and Mermaid output
ci / vet, staticcheck, test, build (push) Failing after 1m58s
release / Build and publish release (push) Successful in 1m10s

- when: on_failure visual distinction: red circle (#d9534f), X-mark icon, dashed
  chip border, and Mermaid classDef; legend entry added
- Job tooltip / detail panel: each chip wrapped in <g data-job="…"><title>…</title>
  <desc>…</desc> so SVG viewers and the HTML sidebar show stage, when, image, needs
- Multi-job connector accuracy: classic mode now uses a bus-bar pattern (vertical
  rail at midpoint + per-job stubs) instead of one center-to-center line per stage pair
- Blocked/skipped state colouring: RenderPipeline and pipelineSVG accept
  *cicontext.Context; skipped jobs rendered in grey (#868686) with dimmed text
- Interactive HTML output (--format html): self-contained .html with inline SVG,
  mouse-wheel zoom, drag-to-pan, double-click reset, and a click-to-open sidebar
- Mermaid pipeline output (--format mermaid): prints existing Pipeline() flowchart
  to stdout; suitable for mermaid.live or Markdown embedding
- imageString() helper to extract image name from string or map form
- 100% statement coverage maintained; 809 tests pass

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
2026-06-25 00:56:06 +02:00
parent 8dc30d9207
commit 0e51844c3a
10 changed files with 690 additions and 99 deletions
+32 -1
View File
@@ -206,7 +206,16 @@ glint graph includes .gitlab-ci.yml > includes.mmd
glint graph pipeline .gitlab-ci.yml
# prints the output path, e.g.: glint-out/pipeline-20260614-143022.png
# Mermaid to stdout + pipeline file path to stderr
# Pipeline graph with skipped-job colouring (grey out context-unreachable jobs)
glint graph pipeline --branch main .gitlab-ci.yml
# Interactive HTML with pan/zoom and job-detail sidebar
glint graph pipeline --format html .gitlab-ci.yml
# Mermaid flowchart of the pipeline to stdout
glint graph pipeline --format mermaid .gitlab-ci.yml
# Mermaid includes graph to stdout + pipeline SVG file path to stderr
glint graph all .gitlab-ci.yml > includes.mmd
# Custom output directory
@@ -224,6 +233,28 @@ include type: orange (main file), purple (project), green (component), blue
**Pipeline graph** — GitLab CI-style SVG rendered to a timestamped file.
Converted to PNG when `rsvg-convert`, `inkscape`, or `magick` is available.
**Pipeline graph formats** (`--format`):
| Flag | Output |
|------|--------|
| `svg` (default) | Write SVG/PNG to `--out` |
| `html` | Write self-contained HTML to `--out` — inline SVG with mouse pan/zoom, drag, and a job-detail sidebar that opens on chip click |
| `mermaid` | Print Mermaid flowchart to stdout |
**Visual chip styles:**
| Type | Colour | Icon | Border |
|------|--------|------|--------|
| regular | blue `#1f75cb` | checkmark | solid |
| manual | orange `#fc6d26` | play triangle | solid |
| trigger | purple `#6b4fbb` | chevron | solid |
| delayed | yellow `#fca326` | clock | solid |
| on_failure | red `#d9534f` | X mark | dashed |
| skipped (context) | grey `#868686` | none | solid |
Pass context flags (`--branch`, `--tag`, `--source`, `--var`) to grey out jobs
that would be skipped in the given pipeline event.
DAG mode (Bézier arrows between jobs) activates automatically when any job has
a `needs:` list; classic mode uses stage-column connectors otherwise.